Victoria Park Pilates Studio

This job was done in conjunction with Artisan Developments.

This job started as an empty room with a bare concrete floor. We worked out the internal walls and bathroom layouts, marked out the concrete floor, cut out where the waste pipes needed to run and installed our under slab drainage. The hot water for the changing rooms was run off an internal Bosch 32 commercial hot water unit, with the flue running up through the roof. Our clients were very impressed with the outcome of our work.